Failed rescue attempt
In September 2025, NASA awarded Arizona-based Katalyst Space a $30 million contract to design, launch and operate a robotic spacecraft to meet up with Swift and boost it to a higher orbit. Katalyst launched its refrigerator-sized, three-armed LINK servicing spacecraft on July 3, targeting an August capture of Swift.
LINK suffered problems with its propulsion system and orientation-maintaining reaction wheels, which prevented the planned meetup. LINK itself crashed back to Earth on September 25, 2026.
"From the beginning, this was a high-risk, high-reward mission," Shawn Domagal-Goldman, director of NASA's Astrophysics Division, said in a statement on September 25. "And while we'll be sad to see Swift's mission come to a close, we knew this boost effort would be worthwhile either way — advancing U.S. spacecraft servicing technology, challenging us to meet unprecedented mission timelines, and testing how we operate satellites to extend their time in low Earth orbit."