Hermes Vector

Space

NASA JPL Completes Testing of Voyager Technologies' Griffin-1 Lunar Lander

Voyager Technologies' Griffin-1 lunar lander has completed rigorous environmental testing at NASA's Jet Propulsion Laboratory. The spacecraft is scheduled to launch later this year to deliver cargo to the Moon's South Pole.

By Hermes-Vector AI Desk

Also in: Español · Português · Français · Deutsch · हिन्दी

Checked against 1 sourceNASA
Illustration for: NASA JPL Completes Testing of Voyager Technologies' Griffin-1 Lunar Lander

In brief

  • Voyager Technologies' Griffin-1 lander completed environmental testing at NASA's Jet Propulsion Laboratory.
  • The mission will deliver over 1,100 pounds of cargo to Nobile Crater near the lunar South Pole.
  • Testing included thermal vacuum, vibration, and acoustic simulations to prepare for launch and space travel.
  • Griffin-1 is scheduled to launch later this year on a SpaceX Falcon Heavy rocket.

NASA JPL Completes Testing of Voyager Technologies' Griffin-1 Lunar Lander

Voyager Technologies’ Griffin Mission One (Griffin-1) lunar lander has successfully completed a series of critical environmental tests at NASA’s Jet Propulsion Laboratory (JPL) in Southern California. The testing, which simulated the extreme conditions of space and launch, confirms the spacecraft is ready for its mission to the Moon later this year.

Mission Scope and Payload

Griffin-1 is part of NASA’s Commercial Lunar Payload Services (CLPS) initiative within the Moon Base Program. The lander is expected to launch aboard a SpaceX Falcon Heavy rocket. It will deliver more than 1,100 pounds (455 kilograms) of cargo to Nobile Crater near the lunar South Pole, classifying it as an infrastructure-class lander.

The mission will carry 10 science and technology demonstrations from six countries. Among these is Astrolab’s FLIP (FLEX Lunar Innovation Platform) rover, which NASA states is the largest commercial payload ever delivered to the Moon.

Rigorous Environmental Testing

Testing began in July after the 2,789-pound (1,265-kilogram) spacecraft traveled from Voyager Lunar Systems’ manufacturing facilities in Pittsburgh to JPL. Engineers conducted several types of tests to ensure the lander could withstand the journey:

  • Mass Properties: Engineers spun the spacecraft on a special table to measure its mass properties and check for unexpected wobbles.
  • Electromagnetic Compatibility: The lander underwent testing inside an anechoic chamber, where foam spikes absorb sound and electromagnetic waves, to ensure electronic components do not interfere with one another.
  • Vibration and Acoustics: A "shaker table" rattled the spacecraft in three directions to simulate launch forces. Additionally, giant horns powered by compressed nitrogen gas blasted the spacecraft with up to 153 decibels in a sealed acoustic chamber to mimic the roar of launch.
  • Thermal Vacuum: In the 25-Foot Space Simulator, a facility listed on the National Register of Historic Places, Griffin-1 was subjected to temperatures ranging from 167 degrees Fahrenheit (75 degrees Celsius) to minus 148 F (minus 100 C) for about two weeks.

Official Statements

Charles Whetsel, manager of the Exploration Systems Development Office at JPL, highlighted the facility's history in supporting lunar exploration.

"NASA JPL’s Environmental Test Laboratory has been putting robotic explorers to the test since the Ranger program gave us NASA’s first up-close views of the Moon’s surface in the mid-1960s. We’re proud to provide our expertise and facilities to support this new phase of commercial lunar exploration," said Whetsel.

John Thornton, executive vice president at Voyager, emphasized the significance of the milestone for future lunar infrastructure.

"Griffin-1 is being built for a historic purpose: to deliver the infrastructure and capabilities to the Moon. Seeing the spacecraft complete this demanding environmental testing is a major milestone because it demonstrates that Griffin-1 is ready for the extreme journey ahead: launch, through deep space, to the lunar South Pole," said Thornton. "This spacecraft represents a new era of commercial lunar exploration, where missions like Griffin-1 are laying the groundwork for the Moon Base and helping turn sustained lunar exploration from a vision into a reality."

Next Steps

Following the completion of testing at JPL, Griffin-1 has returned to Voyager Lunar Systems’ facility for final assembly. The next phase involves launch-readiness operations before the spacecraft is shipped to Cape Canaveral for its scheduled launch.


Sources

This article was drafted with AI assistance and checked against the sources above. Company claims are reported as claims. Cover image is AI-generated.

Questions readers ask

What is the name of the lunar lander that completed testing at NASA JPL?
The lander is called Voyager Technologies’ Griffin Mission One, or Griffin-1.
When did the environmental testing for Griffin-1 begin?
Testing began in July after the spacecraft traveled from Pittsburgh to JPL.
What specific tests did engineers conduct to ensure the lander could withstand the journey?
Engineers conducted mass properties, electromagnetic compatibility, vibration and acoustics, and thermal vacuum tests.
Where will Griffin-1 launch from and what rocket will it use?
It is scheduled to launch aboard a SpaceX Falcon Heavy rocket from Cape Canaveral.
What is the significance of the Astrolab’s FLIP rover on this mission?
NASA states that Astrolab’s FLIP rover is the largest commercial payload ever delivered to the Moon.

The day's checked news, by email

One short email a day with the top stories. Free, and you can unsubscribe in one click.

Or follow for the latest news:

Advertisement

Comments