Hermes Vector

Space

NASA Awards Moon Base Transportation, Technology, Science Projects

NASA announced awards for Moon Base cargo landers, a nuclear-powered rover, launch services, and lunar infrastructure to support a sustained presence at the Moon's South Pole.

By Hermes-Vector AI Desk

Checked against 1 sourceNASA
Illustration for: NASA Awards Moon Base Transportation, Technology, Science Projects

In brief

  • NASA selected eight companies for the CLPS 2 cargo lander contract with a combined maximum value of $10 billion.
  • The PROMISE nuclear-powered rover will land at the Moon’s South Pole in late 2028 for an 18-month mission.
  • NASA awarded six VADR task orders to Arrow Science and Technology, Blue Origin, and Impulse Space for Moon Base cargo transport.
  • NASA awarded Honeybee Robotics, Redwire, and Yank Technologies for components of the miniCAST power and communications system.

NASA Awards Moon Base Transportation, Technology, Science Projects

NASA announced a suite of awards and mission updates on Saturday to expand the agency’s Moon Base exploration, science, and infrastructure capabilities. The investments will advance commercial robotic deliveries, a nuclear-powered rover named PROMISE, launch and orbital transfer services, and surface infrastructure as the agency works with American industry to establish a sustained presence on the Moon’s South Pole.

The agency shared the news at the MAX POWER aerospace expo and air show at NASA’s Kennedy Space Center in Florida.

“We are building the Moon Base mission by mission,” said NASA Administrator Jared Isaacman. “Today’s announcements expand nearly every part of that campaign, using the playbook that carried NASA through its greatest eras: fly often, learn, apply those lessons, and get more better and more capable with every mission. When our astronauts return to the Moon, they will arrive with the first elements of the Moon Base already waiting for them on the surface.”

“In the eight months since Ignition, we’ve made incredible strides in accomplishing the near impossible: establishing a permanent outpost on the lunar surface,” said Carlos García-Galán, manager, Moon Base Program. “We’ve consolidated numerous efforts into a streamlined program, evolving our human exploration architecture into an iterative and sustained campaign for Moon Base technology development and implementation. Most importantly, we’ve taken action, awarding new contracts and forging new partnerships to accelerate development.”

Moon Base cargo landers

To strengthen the cargo lander network needed to support the Moon Base, NASA selected eight companies for the next phase of its CLPS (Commercial Lunar Payload Services) initiative. The companies are eligible to compete for future lunar surface delivery missions under the new CLPS 2 contract:

Blue Origin Firefly Aerospace Intuitive Machines ispace-U.S. Lockheed Martin Space Northrop Grumman Space Systems SpaceX Voyager Technologies

Under the CLPS 2 framework, the companies will provide lunar delivery services, including managing, building, and operating landers that transport NASA science, technology, and infrastructure payloads to the Moon.

The CLPS 2 framework is a 10-year, multiple-award, indefinite-delivery/indefinite-quantity master contract with a combined maximum value of $10 billion. NASA increased the value of the current CLPS 1.0 contract from $2.6 billion to $4.2 billion. The original CLPS contract will remain in place through November 2028.

Nuclear-powered Moon rover

NASA also announced it is moving forward with development of PROMISE (Polar Rover for Observation, Mapping, and In-Situ Exploration). Carrying science instruments and technology demonstrations, the six-wheeled rover will land at the Moon’s South Pole to characterize the surface and subsurface, assess resource potential, and provide data to enable landing site selection, as well as future infrastructure and exploration activities. The nuclear-powered rover can operate during long lunar nights and within permanently shadowed regions thought to harbor ice, which is crucial for a sustained human presence on the Moon.

The agency’s Jet Propulsion Laboratory in Southern California, a division of Caltech, will manage the mission and build the rover from a combination of spare flight components and engineering test models for NASA’s Curiosity and Perseverance Mars rovers. Using proven hardware, software, and Mars rover operation approaches significantly reduces cost and enables integration and testing of the complex PROMISE rover on a shorter timeline. NASA has assessed the compatibility of the hardware with the lunar environment and determined it can tolerate the harsh conditions found near the Moon’s South Pole.

The PROMISE rover will carry a drill to extract regolith, or lunar dust, to characterize ice and other resources from approximately 3 feet (1 meter) below the surface, spectrometers for analyzing the chemical composition of surface material, temperature and radiation sensors, and visible-light cameras. It will demonstrate a next-generation, radiation-tolerant computing system, NASA’s High Performance Spaceflight Computing, and advanced autonomy sensors and algorithms. NASA is targeting late 2028 to launch PROMISE and planning an 18-month mission for the rover.

Launch, transportation awards

Delivering Moon Base infrastructure will require a robust transportation network between Earth and the Moon. Orbital Transfer Vehicles (OTVs) act like long-distance freight trucks, carrying large loads across space. Lunar landers handle the final delivery, bringing supplies, equipment, and infrastructure safely down to the Moon’s surface.

To demonstrate those capabilities, NASA awarded six task orders as part of the agency’s Venture-Class Acquisition of Dedicated and Rideshare (VADR) launch services contract. The awards were given to Arrow Science and Technology, Blue Origin, and Impulse Space to integrate and transport Moon Base cargo.

Three mission types will allow NASA flexibility to fly science and technology demonstrations when they are ready.

The first will include missions to reduce risks of future long-term human spaceflight for lunar exploration. The missions will verify that communication and navigation methods work properly during the journey from Earth orbit to the Moon, and OTV capability to support delivery of a CLPS lunar lander to a desired orbit. This mission type will deliver the CAPSTONE 02 spacecraft to deep space to test proximity maneuvers, navigation, and communications around the Moon.

The second category of missions will prepare the lunar South Pole for human exploration by sending a group of highly mobile drones to survey the surface before astronauts arrive, enabling safer, more informed human missions while demonstrating advanced robotic capabilities. Such missions will include the agency’s MoonFall drones, designed to scout areas beyond the reach of traditional rovers, as well as delivery of additional Moon Base assets necessary to support Phase One objectives.

To reduce risk for future missions, the third mission type will test navigation technologies and demonstrate operations in multiple cislunar orbits, between Earth and the Moon. This mission type will demonstrate commercial orbital transfer capabilities intended to increase the amount of cargo that future landers can deliver to the lunar surface.

The VADR contracts are managed by NASA’s Launch Services Program Office at the agency’s Kennedy Space Center as part of the agency’s Commercial Access to Space Program. By procuring multiple launch and in-space transportation services together, NASA provides industry with a more predictable set of mission opportunities while gaining access to a broader range of commercial capabilities for future lunar exploration.

Some missions will launch aboard Blue Origin’s New Glenn, Relativity Space’s Terran R, and SpaceX’s Falcon 9 rockets.

Complementing those in-space transportation demonstrations, NASA selected SpaceX for the Cislunar Communications Deployment Demonstration under an existing lunar logistics contract. Through a Specialized Delivery Mission task order, SpaceX will launch communications satellites aboard a Starship to cislunar space in 2028. The demonstration will help inform the development of future lunar communications networks that keep astronauts, mission controllers, and the Moon Base connected.

Lunar architecture, infrastructure

To extend infrastructure capabilities on the lunar surface, NASA plans to purchase commercial components for a Mini-Communications and Solar Tower (miniCAST), including solar arrays, batteries, and wireless power-transfer hardware. The agency awarded Honeybee Robotics, a Blue Origin company, for energy storage capability, Redwire for power generation, and Yank Technologies, Inc., for wireless power transfer in support of miniCAST.

The miniCAST will combine power and communications capabilities to support future Moon Base activities. Engineers at NASA’s Marshall Space Flight Center in Huntsville, Alabama, will assemble and test the systems before they are delivered to the lunar surface.

NASA expects work to begin within months, and the initial effort will involve components rather than a major integrated system. The agency also plans a separate solicitation for fully integrated power systems, which is anticipated in early 2027.

NASA intends to release a directed call under its Next Space Technologies for Exploration Partnerships, or NextSTEP-3 B, solicitation to help close architecture-driven, high-priority data gaps for Moon Base development. The effort will help NASA gather information it needs to plan future missions, reduce risk, and support technologies and infrastructure for sustained operations on the Moon’s South Pole. The work could include small spacecraft missions, payloads on future Moon Base flights, or the purchase of data collected by commercial partners.

As part of a Golden Age of innovation and exploration, NASA will send Artemis astronauts on increasingly difficult missions to the lunar South Pole to explore more of the Moon than ever before. In addition to providing economic benefits and advancing scientific discovery through its Moon missions, NASA will establish an enduring human presence on the lunar surface and build on this foundation for the first crewed mission to Mars.

To learn more about the Moon Base, visit:


Sources

This article was drafted with AI assistance and checked against the sources above. Company claims are reported as claims. Cover image is AI-generated.

The day's checked news, by email

One short email a day with the top stories. Free, and you can unsubscribe in one click.

Or follow for the latest news:

Advertisement

How do you feel about this story?

Comments 0

No comments yet. Start the discussion.

Space

China launches 29th group of low-orbit internet satellites

China successfully launched the 29th group of low-Earth-orbit satellite internet satellites on November 9, 2026, using a Long March-12 rocket from the Hainan commercial space launch site.

Checked against 2 sourceschinanews.com.cnnews.cgtn.com